From first inquiry to goods ready to ship usually takes 3 to 5 weeks: a quote within 24 hours, samples in about 7 days, your approval of samples and artwork, then about 15 days of production and batch testing. Ready formulas can ship within 72 hours once packaging is in stock. Sea freight time to your country comes on top.
The timeline step by step
| Step | Typical time | What you do |
|---|---|---|
| 1. Quote | Within 24 hours | Send product, pack size, quantity and market |
| 2. Samples | About 7 days | Test taste, texture and acceptance |
| 3. Artwork | Depends on you | Approve the label and packaging design |
| 4. Production | About 15 days | Pay the deposit |
| 5. Batch testing | Included | Receive the COA |
| 6. Shipping | FOB, CIF or DDP | Arrange import clearance |
Where launches usually lose time
The factory steps are predictable. Delays almost always come from three places: changing the formula after samples, late artwork, and label text that has not been checked against the destination market's rules. Settle your label claims before the sample stage, and send artwork in the final dieline size.
How to launch faster
- Start from a ready formula. Samples come from stock and production can ship within 72 hours once packaging is ready.
- Use standard packs. For example 60 soft chews per bottle or 200 tablets per bottle.
- Combine products in one container. Supplements, treats and food from our two facilities can ship together, so a mixed first order does not mean separate shipments.
What you receive with the goods
A certificate of analysis for every batch, copies of the factory registrations and certificates, and standard export documents. See the certification numbers.









